Fleet management guides for UK operators.
Plain-English guides on DVSA compliance, O-licence obligations, walkaround checks, defects and the practical side of running a UK fleet.
Showing 37–48 of 127 articles
Entry Summary Declarations: An ENS Checklist for UK Hauliers
For accompanied RoRo and Eurotunnel road movements, the haulage company is normally the carrier responsible for ensuring an ENS is submitted.
Cabotage and Cross-Trade: Records UK Hauliers Need in the EU
After a laden UK–EU delivery, a UK haulier can perform limited follow-on work. Use this planner timeline and document checklist.
From POD to Payment: Building a Haulage Invoice Pack That Gets Accepted
Missing references and weak POD delay payment. Use a customer-specific quality gate from completed job to accepted haulage invoice.
Haulage Job Costing: Know the Margin Before the Invoice
Revenue is not margin. Build a transparent haulage job cost from positioning through POD, then compare the quote with the actual result.
HGV Waiting Time and Detention: Records That Support a Charge
There is no universal UK detention rate. A defensible charge starts with agreed terms and ends with clear arrival, delay and departure evidence.
Empty Running in Haulage: How to Measure and Reduce Empty Miles
GB-registered HGVs travelled 5.897 billion kilometres empty in 2025. Measure your own pattern before choosing backhaul or network actions.
Vehicle Safety Recalls: A Check-and-Close Routine for HGV Fleets
A recall search is only the start. Turn manufacturer and GOV.UK recall information into an owned repair, verified closure and auditable fleet record.
Preventing HGV Overloading: Gross, Train and Axle-Weight Checks
An HGV can be under gross weight and still overload one axle. Build gross, train and axle checks into quoting, loading, dispatch and multi-drop work.
HGV Reversing Risk: What Hauliers and Delivery Sites Should Control
Reversing controls are shared across haulier and site. Use the eliminate–segregate–control hierarchy and a driver stop-and-call process.
ADR for Haulage Operators: When Dangerous-Goods Rules Apply
Before accepting a dangerous-goods load, identify the substance, role, quantity and route. This ADR triage guide shows when expert advice is essential.
Subcontractor Haulier Due Diligence: A Practical UK Checklist
A subcontractor checklist does not transfer responsibility. It gives the transport office a controlled basis for choosing and monitoring bought-in capacity.
Adding Vehicles or Trailers to an O-Licence: Margins, Variations and Interim Authority
A spare margin is not unlimited authority. Use this decision tree before adding vehicles, trailers or operating-centre capacity to an O-licence.
Want to manage compliance digitally?
HauliK gives UK transport operators digital walkaround checks, defect tracking, job management and driver compliance — in one platform.