Weekend Transport Handover: A Practical Office Checklist
Prepare a weekend transport handover covering active jobs, asset restrictions, check evidence, customer contacts and decisions requiring escalation.
A weekend handover fails when it contains a list of jobs but none of the decisions behind them. The cover dispatcher sees a trailer allocated, yet does not know it is awaiting a repair review. A driver reaches a closed gate, while the only customer contact is in a weekday planner's inbox.
A weekend transport handover should let the next person act with the same relevant information. Keep it short enough to read and precise enough to use.
Separate planned work from unresolved work
Begin with jobs still active, departures planned during cover and movements that have changed. Add unresolved delivery evidence or customer queries only where they affect the next action.
Distinguish “delivery booked for Saturday” from “Saturday slot requested, not confirmed”. The second statement needs an owner and a decision before the vehicle leaves.
State asset restrictions explicitly
Record which vehicles and trailers are unavailable, why and who can review the restriction. A note reading “probably ready Friday” is not a release decision.
Include equipment away from base and a driver change that affects the expected combination. The next dispatcher should not have to call every driver to discover where trailers finished.
Leave usable customer instructions
For each unusual movement, retain the site reference, entry instructions and cover contact. Confirm who can approve a changed slot, a return or a waiting arrangement.
HSE's delivery guidance highlights cooperation between the carrier and site. A handover needs enough information to maintain that cooperation when normal staff are absent.
Use an exception-first checklist
Give the cover user the items that require attention before a general job list:
- Unconfirmed collection or delivery slots.
- Unassigned or changed drivers and equipment.
- Asset restrictions awaiting an authorised decision.
- Expected check evidence that remains unresolved.
- Failed or partial deliveries needing instructions.
- Named contacts and escalation arrangements.
Add the next action and review time beside each item. “POD outstanding” becomes useful when it says which job, who is following up and whether the invoice or next movement depends on it.
Work through one handover together
A fictional Friday example contains four Saturday jobs. One trailer remains at a customer's yard, one delivery slot is unconfirmed and one vehicle has an unresolved defect assessment. Walk the cover dispatcher through those exceptions before showing the four bookings.
Ask them to explain the next action in their own words. If they need the weekday planner's phone to locate a document, the handover is incomplete even if every job appears on a board.
Keep decisions within authority
Specify who can approve assignment changes, commercial charges and return-to-service decisions. Do not give a temporary cover user broad powers merely to make the weekend easier.
Access should match the person's duties. Use their own authorised account and confirm they can retrieve the relevant records before the first shift. Shared logins make it harder to trace who changed an instruction.
Review the return handover
On Monday, record what changed and what remains open. Review any exceptions that the weekend team could not resolve and update the standard handover if a pattern appears.
HauliK's planning board, available on Ultra, helps organise scheduled work. Its check history supports evidence review. Use both within a named handover process; neither screen automatically communicates every unresolved decision to the next dispatcher.